Tuesday, 18 December 2012

bUiLdiNg SuRveYinG ACADEMIC TRIP

Like I says before this,I have academic trip....
I visited building surveying courses at Univesiti Teknologi Mara(UiTM),Universiti Malaya(UM), and Petronas Twin Towers..
After that we are going to Cameron Highland....




at UM






visit to Petronas Twin Towers
-      sky way
-  upper level



UiTM






lastly....Cameron Highland....
nice rigt??????
haha....

PROJECT 10:EXHIBITION




























After done all the project,exhibition coming..................
hahaha....so that all the sweet moment during the exhibition....
the theme is"colourful domino...."

PROJECT 9:INTEGRATED PROJECT

     Wow!!!!!haha.....integrated project........from previous project,we need to do the Batu Ferenggi Information Centre.I think this project  like a reality project because all thing must be consider in the building.
We must planning,managing and designing..best project..also tough project....
For 9a,four board must be submit..
  board 1     -site analysis of Batu Ferenggi
  board 2&3-schematic design(design concept),presentation drawings
  board 4      -material selection,building service
For 9b,development proposal
and 9c,model........huh.......

       That time,I have other programme also like Building Surveying Academic Trip and International Pesta Hockey USM Penang..What can I do? I very worry about my project and on that time I also must give commitment to the event.
        Firstly,I want to opologize to all members group and I hope you all understand..But,I try to managed my time as well.I settle down my part for this project.....





haha....so......above that our model and our design...nice right?so....anyone need the building,you all can call me...
These are the characteristis our design
   -'wave' concept
   -have lobby area(reception,sales area and waiting area),exhibition space and toilet
   -suitable for information centre 
#other information,you all can get me.....:)

PROJECT 8:(RE)VISITED

This project doing by group.....
The site we visited is Batu Ferenggi in Pulau Pinang....
What we need to do is
   a)community facility and tourism activity that have in Batu Ferenggi.


   













  b)environment and spatial analysis.

PROJECT 7:INTERLINKED

Now.....
Begin the project by group.......
The project also separate to three.....
ohh......so many things need to do.....
but the project is interesting....why??????
haa.......let see.....

This is skyway.....connected from building E48 to the E08.

This is our model and the concept is tetris.

Design development "tetris trught me the fundamental of architecture"....





This project about skyway and we need do the site analysis and presentation drawing.
My group choose TETRIS because want to show people that school of HBP is the one of the best when this skyway become reality in school HBP...........





this the presentation drawing......




and....this site analysis........

PROJECT 6:PROJECT DEVELOPMENT

       Actually,we must know what is the role of each major in HBP programme because it very related to development project.For example,what is the role of building surveying in a project?So,we must take noted and alert what is the main role for each programme.
       For this project,we need to explore the main of each programme from start a project development until the project finished.So,I do this in mind mapping for easier remember.
In a project development,we have three stages:
   1)PRE-DEVELOPMENT
   2)CONSTRUCTION STAGE
   3)POST CONSTRUCTION
Player in construction industry:
 -Architecture
 -Interior design
 -Project management
 -Planner
 -Quantity surveyor
 -Building surveyor
 -Building technology
  -etc
                                                                                             
                                                                                    
I get the information from Uniform Building By Law(UBBL). I major in building surveyor,so I would like to explain what is building surveyor and what the role.


BUILDING SURVEYING
       - BUILDING CONTROL AND COMPLIANCE
       ~ BUILDING QUALITY                      
          -CONSTRUCTION & BUILDING COMPLETION      
             -BUILDING AUDIT AND COMPLETION 

         ~ BUILDING PERFORMANCE
           -MAINTENANCE &  CONSERVATION
              -RISK ASSEMENT  & MANAGEMENT


    - TO PRODUCE PERFECT & SUSTAINABILITY BUILDING


#That is the conclusion what is the building surveying.....





PROJECT 5:BLUEPRINT

This project,I need some equipment.........Actually,when we are in HBP,we must have all these equipment.....So,be clever on managed your money in first year HBP.......

        With these equipments,we must drawing back  based on the previous project,sculpture.The project required to produce plan elevations(front,left,right and rear) drawings.The drawing should be coloured based on the sculpture model.Drawing should be in A3 size in scale 1:2.
        I think this project not hard to me,because from my previous school,I was learned about subject technical drawing.So,that is advantage to me.But,I have problems with axonometric drawing.I try learned it from my fellow friends and their give fully cooperation.Thank you friends.....




        MY SCULPTURE













my DRAWINGS














PROJECT 4:SCULPTURE


A sculpture is to be erected on as per given site on an A3 mounting board. Communicate your inner selves. Your creation (and imagination) needed to co-work within the limited spaces, and time set.
Submission formats:
        1. Theme : SUSTAINABLE
        2. Materials :  No restriction in materials to be selected (new/recycled)
        3. Sculpture size :  Width 250 mm, Length 300 mm, Height 450 mm (maximum)
        4. About the : It’s a must to include (a freehand) written statement to
            describe of the sculpture about (either on the right or left
           empty space - you decide)
        5. Board hand-in :  The sculpture is to be attached to the mounting board (permanently)


What is sculpture?What is different sculpture and monumen?How to relate the sculpture and sustainable?
That some question in my mind?So,I take time to do it.I always searching in internet to get the answer.Finally....... I get the answer.
(Sculpture is the branch of the visual arts that operates in three dimensions, and one of the plastic arts. Durable sculptural processes originally used carving (the removal of material) and modelling (the addition of material, as clay), in stonemetalceramicswood and other materials but, since modernism, shifts in sculptural process led to an almost complete freedom of materials and process. A wide variety of materials may be worked by removal such as carving, assembled by welding or modelling, or molded, or cast.)

After that,I try do something like different.Then....The result like this.....

    I choose bicycle because the bicycle symbolize the concept sustainability.For materials,I use sustainability materials also.The body of bicycle I use tree branches.The connection between tree branches I use tap.For the tyre I use bottle.I use bottle because  bottle is the one materials that we can reuse.So,this is my sculpture..........

PROJECT 3:EXTERIORS

The project 3,issued by Ar,Haris Fadzilah Abdul Rahman.So,what happen this time?Let we see.......
After two projects,I think I have some improvement in drawing....
 Why I say like that? Let see......:)

See....This is my drawing in project 3a.The project need drawing man-made structure in school of Housing,Building and Planning(HBP).This project just white and black and play with the shading and shadow.This is the one part of building HBP.
Another one is natural structure that have in school HBP.......


Sustainability is very important and leaf is the one of sustainability.that also one of the reason why I drawing leaf and I very like with the role of leaf in the world.Try to imagine when the leaves are not in this world.What happen?

What is most important,I satisfied with both of my drawing.I learned something from that and I get the new skills.This project was give me support to stay in school of HBP and increase my spirit to do better in future