Tuesday, 18 December 2012

bUiLdiNg SuRveYinG ACADEMIC TRIP

Like I says before this,I have academic trip....
I visited building surveying courses at Univesiti Teknologi Mara(UiTM),Universiti Malaya(UM), and Petronas Twin Towers..
After that we are going to Cameron Highland....




at UM






visit to Petronas Twin Towers
-      sky way
-  upper level



UiTM






lastly....Cameron Highland....
nice rigt??????
haha....

PROJECT 10:EXHIBITION




























After done all the project,exhibition coming..................
hahaha....so that all the sweet moment during the exhibition....
the theme is"colourful domino...."

PROJECT 9:INTEGRATED PROJECT

     Wow!!!!!haha.....integrated project........from previous project,we need to do the Batu Ferenggi Information Centre.I think this project  like a reality project because all thing must be consider in the building.
We must planning,managing and designing..best project..also tough project....
For 9a,four board must be submit..
  board 1     -site analysis of Batu Ferenggi
  board 2&3-schematic design(design concept),presentation drawings
  board 4      -material selection,building service
For 9b,development proposal
and 9c,model........huh.......

       That time,I have other programme also like Building Surveying Academic Trip and International Pesta Hockey USM Penang..What can I do? I very worry about my project and on that time I also must give commitment to the event.
        Firstly,I want to opologize to all members group and I hope you all understand..But,I try to managed my time as well.I settle down my part for this project.....





haha....so......above that our model and our design...nice right?so....anyone need the building,you all can call me...
These are the characteristis our design
   -'wave' concept
   -have lobby area(reception,sales area and waiting area),exhibition space and toilet
   -suitable for information centre 
#other information,you all can get me.....:)

PROJECT 8:(RE)VISITED

This project doing by group.....
The site we visited is Batu Ferenggi in Pulau Pinang....
What we need to do is
   a)community facility and tourism activity that have in Batu Ferenggi.


   













  b)environment and spatial analysis.

PROJECT 7:INTERLINKED

Now.....
Begin the project by group.......
The project also separate to three.....
ohh......so many things need to do.....
but the project is interesting....why??????
haa.......let see.....

This is skyway.....connected from building E48 to the E08.

This is our model and the concept is tetris.

Design development "tetris trught me the fundamental of architecture"....





This project about skyway and we need do the site analysis and presentation drawing.
My group choose TETRIS because want to show people that school of HBP is the one of the best when this skyway become reality in school HBP...........





this the presentation drawing......




and....this site analysis........

PROJECT 6:PROJECT DEVELOPMENT

       Actually,we must know what is the role of each major in HBP programme because it very related to development project.For example,what is the role of building surveying in a project?So,we must take noted and alert what is the main role for each programme.
       For this project,we need to explore the main of each programme from start a project development until the project finished.So,I do this in mind mapping for easier remember.
In a project development,we have three stages:
   1)PRE-DEVELOPMENT
   2)CONSTRUCTION STAGE
   3)POST CONSTRUCTION
Player in construction industry:
 -Architecture
 -Interior design
 -Project management
 -Planner
 -Quantity surveyor
 -Building surveyor
 -Building technology
  -etc
                                                                                             
                                                                                    
I get the information from Uniform Building By Law(UBBL). I major in building surveyor,so I would like to explain what is building surveyor and what the role.


BUILDING SURVEYING
       - BUILDING CONTROL AND COMPLIANCE
       ~ BUILDING QUALITY                      
          -CONSTRUCTION & BUILDING COMPLETION      
             -BUILDING AUDIT AND COMPLETION 

         ~ BUILDING PERFORMANCE
           -MAINTENANCE &  CONSERVATION
              -RISK ASSEMENT  & MANAGEMENT


    - TO PRODUCE PERFECT & SUSTAINABILITY BUILDING


#That is the conclusion what is the building surveying.....





PROJECT 5:BLUEPRINT

This project,I need some equipment.........Actually,when we are in HBP,we must have all these equipment.....So,be clever on managed your money in first year HBP.......

        With these equipments,we must drawing back  based on the previous project,sculpture.The project required to produce plan elevations(front,left,right and rear) drawings.The drawing should be coloured based on the sculpture model.Drawing should be in A3 size in scale 1:2.
        I think this project not hard to me,because from my previous school,I was learned about subject technical drawing.So,that is advantage to me.But,I have problems with axonometric drawing.I try learned it from my fellow friends and their give fully cooperation.Thank you friends.....




        MY SCULPTURE













my DRAWINGS